Not sure if this fits your room?
DIY-friendly installation • Guides included • Pro installer optional (not provided directly)
The Uneekor EYE XO2 x Carl's Curved Golf Simulator Package brings high-quality indoor golf to your home with an immersive curved enclosure, Uneekor's flagship overhead launch monitor, and a complete set of premium components. The curved design wraps the impact screen around your field of view for unmatched immersion that flat screens can't match.
What's in the Package
- Curved Golf Simulator Enclosure — Premium curved impact screen with Blackstop™ light-absorbing fabric for a theater-like environment. Steel fittings and pipes included. Available in 9.5x14.5x10, 9.5x16x10, 10x15x10, and 10x17x10 (H x W x D feet).
- Uneekor EYE XO2 Launch Monitor — Flagship overhead photometric tracker with high-speed cameras and non-marked ball technology. Includes protective case and overhead frame mount.
- Uneekor Player Package + 3-Month Champion Package Trial — Essential ball and club tracking features plus access to GSPro, E6 Connect, Creative Golf, and Uneekor software.
- 1-Year GSPro Software License — 200+ real-world courses with 4K graphics and realistic ball physics.
- Epson PowerLite L695SE Projector — Ultra-bright 4K-enhanced visuals with short-throw lens (0.5–0.7 ratio). Fills screens up to 500". Laser light source for long life. Ceiling mount included.
- Launch Monitor Frame Mount — Attaches EYE XO2 to enclosure frame for overhead tracking.
- Projector Ceiling Mount — Clean, professional overhead installation.
- Carl's 6x10 HotShot Hitting Mat — Premium fairway feel with cushioned construction. Sized for the larger curved enclosure footprint.
- HotShot Foam Divot Strip + Golf Mat Tee Pack — Realistic turf interaction and multiple tee sizes.
Space Requirements
Allow 7 feet clearance on every side. Minimum 10.5-foot ceilings. Plan tee position approximately 13.5 feet from screen center. Ships to US only.

The Power of Precision Meets the Curve
Carl's curved enclosure wraps the impact screen around your field of view, creating an immersive environment that flat screens simply can't match. Combined with the steel fittings and premium impact screen, this is a purpose-built space for serious indoor golf.
Every angle, every detail, every swing -- the curve puts you on the course.

Uneekor Accuracy + GSPro Course Play
Mounted to the frame of your enclosure, the EYE XO2's overhead sensors deliver accurate club and ball tracking on every shot. Pair it with GSPro and you've got true-to-life golf sim with 4K graphics, spot-on ball physics, and plenty of ways to play.
Includes 3 months of the Uneekor Champion Package for access to GSPro and other third-party software.

Crisp Visuals Meet Seamless Setup
The Epson PowerLite L695SE blasts ultra-bright 4K-enhanced visuals from just a few feet away. Short-throw design is perfectly suited for the curved enclosure -- mount it close and fill the entire screen with stunning detail.
Laser light source means years of maintenance-free operation. No bulbs to replace.

A Mat That Feels Like the Fairway
Take every swing with confidence on Carl's 6x10 HotShot hitting mat. The premium turf surface mimics the feel of a real fairway with cushioned construction that protects your joints during marathon sessions.
Sized to fill the larger curved enclosure footprint. Includes foam divot strip for realistic turf interaction and a tee pack to get you started immediately.
Details
You're here to focus on your game, not on complicated setups. The EYE XO2 Curved Golf Simulator Package is built to bring high-quality indoor golf to your home without the headaches. Everything is included — just assemble, connect, and start swinging.
Package Features
Curved Golf Simulator Enclosure Kit
The Curved Golf Simulator Enclosure creates a fully immersive space for every shot. The Premium Impact Screen delivers a crisp projected image and is engineered to safely catch every ball, even at high speeds. The enclosure is wrapped in Blackstop™ fabric, a light-absorbing material that minimizes distractions — creating a darkened, theater-like environment that keeps all the focus on the screen and your game.
The kit includes steel fittings and elbows that connect the pipes, plus pre-cut and marked 2-inch EMT pipe that ships Freight. You'll receive all the exact lengths required — no pipe cutting or hauling required.
EYE XO2 Curved Golf Package Includes
- Curved golf enclosure
- Pipes and fittings to construct your frame
- Premium golf screen
- Uneekor EYE XO2 launch monitor with protective case
- Player Package plus 3 Month Trial of Champion Package
- 1-year GSPro software license
- Epson L695SE projector
- Mounts to attach the launch monitor to your enclosure frame, and your projector to the ceiling
- Carl’s 6’x10’ HotShot Golf Mat with foam insert
Reliable Ball and Club Data
Known for precision and reliability, the Uneekor EYE XO2 provides advanced overhead tracking to deliver detailed ball and club data on every swing.
Purchase includes the Player Package, providing essential ball and club tracking features, plus a 3-month trial of the Champion Package, which unlocks third-party compatibility for software like GSPro.
High-Quality Course Play and Practice Tools
The included GSPro software license lets you dive into a full suite of simulation features — from detailed swing analysis to virtual rounds on a massive library of courses. Combined with Uneekor’s tracking data, GSPro gives you the tools to improve your game, whether you’re practicing at home or entertaining guests in a commercial space.
After the included 3-month trial of the Uneekor Champion Package, you’ll need to upgrade to keep using GSPro.
Stunning Projection with the Epson L695SE
Experience the extraordinary versatility and performance of the bright and compact PowerLite® L-Series. The PowerLite L695SE features a short 0.5 – 0.7 throw ratio and can fill a display up to 500", making it perfectly suited for curved golf simulator enclosures.
Carl’s HotShot™ Golf Mat
Designed with anti-fatigue technology, the HotShot™ Golf Mat offers a cushioned feel to keep you comfortable during extended practice sessions. The mat features a centered, realistic foam hitting area that works for both right- and left-handed golfers. Its firm yet forgiving surface replicates the feel of a real fairway, providing the right balance of comfort and performance for any indoor golf setup.
Get Started
Ideal Space Requirements
Give yourself about 7 ft on every side for the most comfortable swing. You don’t want to feel like you’ll bump into anything. To stay safe from bounceback and position your tee to work with the EYE XO2, plan for a tee position right around 13.5 feet from the center of the screen (screen apex).
You need a ceiling that’s at least 10.5 feet high for this setup.
Expect to mount the projector lens between 16’’ and 16’ 6” away from the center of the screen.
Technology Requirements
You’ll need a computer to run your launch monitor and software.
Launch monitor requires: Intel i5 8400 (Not compatible with Mac iOS), 8 GB RAM, GeForce GTX 1060 (AMD: 3rd gen Ryzen or higher and AMD Ryzen 3600X or higher — AMD 2700 is not compatible), Windows 10 (64 bit) Version 1803 or higher, Ethernet Port Required
GSPro requires (for 4K): 20GB free space, RTX 3080 (or better) GPU, 32GB memory
Ordering Information
Shipping Limitation
This golf simulator package ships to US locations only. Contact us for non-US bundles.
Multiple Shipments
Your order may arrive in separate shipments.
Resources
Documents
Curved Enclosure Assembly
See the assembly of a Carl's Place Curved Golf Enclosure.
Launch Monitor Mounting
See us frame mount a Uneekor Launch Monitor.
How to prevent your impact screen from getting dirty.
- Use white balls without dirt, grass or marker on them.
- Clean your clubs often – it will also benefit parts of your game like ball spin.
- Store your screen in a safe, clean and dry environment – if you ever need to pack it away.
- If possible, stay away from keeping it folded in a box for a long time to avoid longer-term creases and wrinkles.
- Make sure you use the right side of the screen; the front has a Carl’s Place logo in the corner. Your new impact screen has a front and a back, and only the front is rated to withstand the impact of real golf balls.
Read more: ‘How To Clean Your Golf Impact Screen, and Make It Last’.
Safety Tips
Please make sure to take proper safety precautions to protect ceilings, walls, windows, and surrounding areas. Keep children, pets, and spectators out of swing range.
What Golfers Are Saying
A top-tier overhead launch monitor that shines for golfers who love swing analysis, coaching tools, and deep practice sessions. Extremely solid real-world performance with rare misreads and no-reads.
The integration is seamless, solid, and easy to install. There is zero shot delay.
Putting and chipping are so realistic and accurate that it makes you feel you are really playing the course.
I just ordered my Eye XO2 — one major buying argument was its integrated G-Vision feature and the expanded 28×21” hitting area. Couldn’t be more excited.
Reviews sourced from the golf simulator community